Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 7800 feet <br />Net Correction: I 0.813 <br />NA <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />0.980 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: I 0.813 <br />NA <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time (min) <br />1 <br />1400.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2972 <br />0.53 <br />Haul Time: 0.53 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />5.00 <br />3.00 <br />8.00 <br />1931 <br />0.81 <br />Return Time: 0.81 minutes <br />Total Scraper team cycle time: 2.94 minutes <br />Adjusted for job conditions: 962.33 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 962.33 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,924.65 LCY/Hour <br />Unadjusted unit production/hour: 1,183.67 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Total job time: 73.72 Hours <br />Unit cost: $0.937 /LCY Total job cost: $132,964 <br />