My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-22_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2020-06-22_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 12:12:07 PM
Creation date
6/22/2020 12:01:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
6/22/2020
Doc Name
Updated Circes
From
DRMS
To
Peabody Energy
Type & Sequence
RN5
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary <br />Site: Yoast Mine Permit Action: RN5 Pennit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/6/2020 County: Routt <br />User: DCI <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: None <br />Filename: C082-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />031 <br />032 <br />035 <br />037 <br />041 <br />043 <br />044 <br />046 <br />052 <br />060 <br />065 <br />066 <br />067 <br />068 <br />070 <br />074 <br />080 <br />081 <br />085 <br />086 <br />087 <br />Herbicide Plateau Remains <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.00 <br />$24,483 <br />$8,600 <br />$27,401 <br />$18,362 <br />$12,734 <br />$28,311 <br />$54,433 <br />$104,019 <br />$132,964 <br />$671 <br />$27,678 <br />$13,995 <br />$10,226 <br />$19,967 <br />$17,205 <br />$56,100 <br />$121,866 <br />$125,627 <br />$57,429 <br />$11,474 <br />$2,814 <br />$53,662 <br />Re rade Pond 011 <br />DOZER <br />30.20 <br />Re rade Pond 012 <br />DOZER <br />96.23 <br />Reconstruct Drainage Channels <br />POSTMININ <br />G <br />106.86 <br />Re rade Pond 12A <br />DOZER <br />44.72 <br />Replace Topsoil from Stock ile B to Shop Area <br />SCRAPERI <br />15.70 <br />Replace Topsoil from Stockpile Haul Fill from to <br />Neck Pit <br />SCRAPERI <br />30.18 <br />Replace Topsoil from Stockpile I to Entrance Road <br />and Wadge <br />SCRAPERI <br />57.67 <br />Replace Topsoil from Stockpile L to Unreleased <br />Pond 12 Area <br />SCRAPERI <br />73.72 <br />Replace Topsoil from Stockpile to MR -18 Drill <br />Pads <br />DOZER <br />0.63 <br />Seal All Monitoring Wells and Exploration Holes <br />BOREHOLE <br />204.00 <br />Drill Seed Mix 1 <br />REVEGE <br />173.90 <br />Drill Seed mix 2 <br />REVEGE <br />19.00 <br />Drill Seed Mix 3 <br />REVEGE <br />10.00 <br />Broadcast Seed Mix 1 <br />REVEGE <br />13.00 <br />Shrub/Tree Planting - List 1 - Areas NOT Released <br />REVEGE <br />20.00 <br />Drill Seed Mix 1 - Reseed Phase II Areas -100% of <br />252.3Acre <br />REVEGE <br />252.30 <br />Rill and Gully and Road Maintenance <br />SITEMAINT <br />ENANCE <br />0.00 <br />Clean Sediment Ponds 010, 011, 011A, 012, 012A <br />and 014 Twice <br />TRUCKI <br />145.87 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />3.33 <br />Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE <br />3.33 <br />Mobilize/Demobilize Equipment for Site <br />Maintenance <br />MOBILIZE <br />11.33 <br />SUBTOTALS: <br />1311.97 <br />$930,021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.