Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile B to Shop Area <br />Site: Yoast Mine Permit Action: RN5 Pennit/Job#: C1994082 <br />PROJECT IDENTIFICATION <br />Task #: 041 <br />Date: 2/7/2020 <br />User: DCl <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />C'.oct Breakdown: <br />COSTShift basis: 1 per day <br />-Scraper: Cat 637G w/ <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Abbreviation: None <br />Filename: C1994082 <br />Scraner Wnrk Team Sunnort Fniiinment Maintenance F.auinment <br />Total work team cost/hour: $1,803.58 <br />MATERIAL OUANTITIES <br />Initial volume: 25,451 CCY Swell factor: 1.115 <br />Loose volume: 28,378 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: <br />Scraper Dozer <br />Load Area Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 NA <br />NA NA <br />25 <br />Adjusted Capacity: <br />Ownership cost/hour: <br />$174.06 NA <br />NA NA <br />$64.10 <br />$68. <br />Operating cost/hour: <br />$190.35 NA <br />NA NA <br />$14.04 <br />$25. <br />%Utilization -ripper: <br />NA NA <br />NA NA <br />NA <br />IN <br />Ripper own. cost/hour: <br />NA NA <br />NA NA <br />$0.00 <br />$0. <br />Ripper op. cost/hour: <br />NA NA <br />NA NA <br />$0.00 <br />$0. <br />Operator cost/hour: <br />$30.86 NA <br />NA NA <br />$28.52 <br />$21. <br />Unit Subtotals: <br />$395.26 NA <br />NA NA <br />$106.66 <br />$115. <br />Number of Units: <br />4 0 <br />0 0 <br />1 <br />Group Subtotals: <br />Work: $1,581.04 <br />Support: $0.00 <br />Maint: <br />$222.54 <br />Total work team cost/hour: $1,803.58 <br />MATERIAL OUANTITIES <br />Initial volume: 25,451 CCY Swell factor: 1.115 <br />Loose volume: 28,378 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: <br />2,100 lbs/LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />38.86 LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />