Laserfiche WebLink
Materials Needed: <br />Geotextile (SY incl. 15% wastage): 6,804 <br />Riprap (CY): 0 <br />Excavation (CY): 1,164 <br />Costs: <br />Material Costs: Geotextile (SY): $1.77 Riprap (CY): $31.50 <br />Labor Cost: $0.27 $12.70 <br />Equipment Cost: $0.00 $14.65 <br />Means Reference 3132 1916 1510 3137 1310 0100 <br />Totals <br />Geotextile (SY): $13,880.67 <br />Riprap (CY): $0.00 <br />Excavation (CY): $4,481.36 <br />Hours: <br />Geotextile (SY): 77.76 <br />87.50 SY/HR <br />Riprap (CY): 0.00 <br />7.75 CY/HR <br />Excavation (CY): 29.10 <br />40.00 CY/HR <br />Total Post -Mining Channel Reconstruction hours: 106.86 Hours <br />Total Post -Mining Channel Reconstruction Cost: $18,362 <br />Excavation (CY): $0.00 <br />$2.46 <br />$1.39 <br />3123 1642 0310 <br />