My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-06-16_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 7:55:55 AM
Creation date
6/17/2020 7:30:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
6/16/2020
Doc Name
Reclamation Cost Estimate
From
DRMS
To
GCC Energy
Type & Sequence
TR29
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mineseal Worksheet Cont'd Task # TTT Page 7 of 11 <br />TRUCK/LOADER TEAM WORK <br />Task description: King II - topsoil from stockpile on KIll portals & access rd. <br />Site: King Coal Mine Permit Action: TR29 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 40 <br />Date: 6/16/2020 <br />User: JHB <br />State: Colorado <br />County: La Plata <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Equipment Description <br />Truck Loader Team -Truck: Generic 7-8 cy, 4x4 <br />-Loader: CAT 938H <br />Abbreviation: None <br />Filename: C035-40 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />NA <br />-Dump, Area: <br />CAT 938H <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $281.96 <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$13.64 <br />$26.49 <br />NA <br />$26.49 <br />NA <br />NA <br />Operating cost/hour: <br />$26.55 <br />$33.66 <br />NA <br />$33.66 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />50.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$40.65 <br />NA <br />$40.65 <br />NA <br />NA <br />Unit Subtotals: <br />$40.19 <br />$100.79 <br />NA <br />$100.79 <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $181.17 <br />Support: $100.79 <br />Maint $0.00 <br />Total work team cost/hour: $281.96 <br />MATERIAL QUANTITIES <br />Initial volume: 1,694 <br />CCY <br />Loose volume: 2,058 <br />LCY <br />Source of estimated volume: <br />2.1 acres <br />Source of estimated swell factor: <br />Cat Handbook <br />Material Purchase Cost: <br />$0.00 <br />Total Cost: <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacitv: <br />Truck Payload (weight) Basis: <br />Material weight: <br />1,600 <br />Description: <br />Top Soil <br />Rated Payload: <br />20,300 <br />Payload Capacity: <br />12.69 <br />Swell factor: 1.215 <br />Pounds/LCY <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.