My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-06-16_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 7:55:55 AM
Creation date
6/17/2020 7:30:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
6/16/2020
Doc Name
Reclamation Cost Estimate
From
DRMS
To
GCC Energy
Type & Sequence
TR29
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mineseal Worksheet Cont'd Task # TTT Page 5 of 11 <br />BULLDOZER RIPPING WORK <br />Task description: Rip King III portal access road <br />Site: King Coal Mine Permit Action: TR29 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 36 <br />Date: 6/16/2020 <br />State: Colorado <br />County: La Plata <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - SSU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL OUANTITIES <br />Abbreviation: None <br />Filename: C035-36 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />$103.86 <br />Utilization % <br />NA <br />$82.26 <br />100 <br />$10.43 <br />NA <br />$8.38 <br />100 <br />$41.24 <br />NA <br />$246.17 <br />$246.17 <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />BCY <br />NA <br />Area: 0.32 acres Rip Depth (ft): 1.50 <br />Volume: <br />774 BCY or CCY <br />Source of estimated quantity: Map King If -007M, 640 ft. L x approx 22 ft. w <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />feet/pass <br />Average Ripping Width: <br />7.08 <br />feet/pass <br />Average Ripping Length: <br />50.00 <br />feet/pass <br />Average Dozer Speed: <br />88.00 <br />feet/minute <br />Average Maneuver Time: <br />0.25 <br />minutes/pass <br />Production per unit area: <br />0.596 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.596 <br />Acres/hr <br />Site Altitude: <br />7,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.49 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.49 <br />Acres/hr <br />JOB TIME AND COST <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.