Laserfiche WebLink
Mineseal Worksheet Cont'd Task # TTT Page 3 of 11 <br />BULLDOZER WORK <br />Task description: King III portals - grade access road, <br />Site: KinLy Coal Mine Permit Action: TR29 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 30 <br />Date: 6/16/2020 <br />User: JHB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$103.86 <br />Utilization % <br />NA <br />$82.26 <br />100 <br />$10.43 <br />NA <br />$0.00 <br />0 <br />$41.24 <br />NA <br />$237.79 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,707 <br />Swell factor: 1.165 <br />Loose volume: 1,989 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />79 <br />Map King 1I -007M (5/8/2020 <br />Cat Handbook <br />50 feet <br />1.400.0 LCY/hr <br />Consolidated stockpile 1.0 <br />Average push gradient: 5% <br />Average site altitude: 7,500 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.200 (SLOT) <br />Abbreviation: None <br />Filename: C035-30 <br />CIRCES Cost Estimating Software <br />