Laserfiche WebLink
Mineseal Worksheet Cont'd Task # TTT Page 9 of 11 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />900.00 <br />3.00 <br />4.00 <br />7.00 <br />1568 <br />0.612 <br />Haul Time: 0.612 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(tpm) <br />Travel Time <br />(min) <br />1 <br />900.00 <br />-3.00 <br />4.00 <br />1.00 <br />2913 <br />0.340 <br />Return Time: 0.340 <br />Total Truck Cycle Time: 2.755 <br />Loading Tool unit <br />Production 455.16 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />165.66 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 274.99 <br />Adjusted single truck/loader team production: 274.99 <br />Adjusted multiple truck/loader team production: 274.99 <br />JOB TIME AND COST <br />Fleet size: I <br />Unit cost: $1.025 <br />Team(s) Total job time: 7.48 <br />/LCY Total job cost: $2,110 <br />minutes <br />minutes <br />377.78 <br />LCY/Hour <br />137.49 <br />LCY/Hour <br />2 <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />