My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-16_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-06-16_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:50:22 PM
Creation date
6/16/2020 3:49:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/16/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Midterm Review Items <br /> The Division reviewed another item that has no specific requirement in the Regulations <br /> requiring their review. Regarding the timing of backfilling and grading (Rule 4.14.1), TMI has <br /> been granted a variance from the requirement that this operation be performed within 180 days <br /> after coal removal. This variance was granted in the approval of a permit revision in 1988 <br /> (PR-02). <br /> Regarding the D/E Pit, which has been temporarily abandoned and left open for an extended <br /> period of time, a plan to use this pit for utility waste disposal (ash from the Craig Power Plant) <br /> has been approved (as discussed in PR-02). TMI is proposing a revision to the post mine <br /> topography of the D/E pit with PR9 based on projected future reductions of coal ash placement <br /> as a result of known and probable future Craig Station unit closures. At the writing of this <br /> document, PR9 is currently under review by DRMS. <br /> Bond <br /> DRMS is currently reviewing PR9 which updates the projected liability amount for the permit <br /> term. The PR9 cost estimate will update the site-wide estimate for the reclamation liability at <br /> the site based on the revised operation and reclamation plan. DRMS projects issuing a <br /> decision on PR9 on June 30, 2020, however this is subject to change. With the approval and <br /> issuance of TR124 on May 19, 2020, DRMS increased TMI's liability for the Trapper Mine by <br /> $8,106,155.00. Also, with the approval of SL20 on May 20, 2020, DRMS evaluated the <br /> reclamation liability at the site and found the current required surety of$29,491,874.54 to be <br /> sufficient to complete reclamation of the affected land. The Division currently holds a <br /> corporate surety of$30,500,000.00 for the Trapper Mine. <br /> SECTION III - REQUESTED REVISIONS OF PERMIT APPLICATION and <br /> MIDTERM ADEQUACY QUESTIONS <br /> As a result of this midterm review, for the purpose of fulfilling the requirements of the <br /> Colorado Surface Coal Mining Reclamation Act, and the Regulations of the Colorado Mined <br /> Land Reclamation Board for Coal Mining, pursuant to Rule 2.08.3, the Division finds that the <br /> permit application C-1981-010 contains the below bulleted deficiencies. The Division requests <br /> that the permittee correct the deficiencies by submission of revised permit pages under <br /> appropriate revision applications, by September 30, 2020. <br /> The Division recognizes that sections of the permit are currently being revised by PR9. <br /> 2.03.4 Identification of Interest <br /> • If PR9 is not issued, TMI will need to update the applicable information in Section 1 of <br /> the permit binder. <br /> 2.04.7 Hydrology Description <br /> MT8_Trapper Midterm 2020 Findings JLE.docx Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.