Laserfiche WebLink
2005 Phase II bond release request, SL-06, approved for 819.1 acres <br /> 2006 Phase III bond release request, SL-07, approved for 762.8 acres <br /> 2006 A major slide occurred in October 2006 at the East Panel. <br /> 2008 Renewal RN-05 approved. <br /> 2008 AD Adding Disturbed and Affected Acreage that was never added to <br /> permit from RN3/PR4 in 5/13/1998.jrc <br /> 2008 TR103 Mining and Reclamation Plan Updates in A, K&Z Pits; Update <br /> Deal and Horse Gulch Pond Information <br /> 2008 SL10 Phase III Bond Release For Trapper Mine Rangelands Located in <br /> A, D, and H Pits of 305.0 acres. Released liability of$228,664.00. <br /> 2009 SL8 Phase I Bond Release for Trapper Mine Land Reclaimed Between <br /> 2003 and 2007 of 476.6 acres. Released liability of$0.00. <br /> 2009 SL9 Phase 11 Bond Release on 294.6 acres of land at the Trapper Mine. <br /> Released liability of$898,333.00. <br /> 2009 PR6 Proposed Trapper Mine Plan for 5 Year Permit Term 2007-2012. <br /> Mine plan, including placement of overburden spoil material from the K <br /> Pit into Horse Gulch Fill and K Pit Buttress Fill. <br /> 2010 TR106 Revision to the Mining Sequence in K-Pit, including removal of K <br /> Pit Buttress Fill from the plan. <br /> 2011 SLl 1 Phase I Bond Release on 57.8 Acres. Released liability of$0.00. <br /> 2012 SL12 Phase 11 Bond Release of 4 Parcels, 165.5 acres total. Released <br /> liability of$0.00. <br /> 2012 SL13 Phase III Bond Release for Trapper Mine Rangelands in A, D, and <br /> F Pits. Released liability of$0.00. <br /> 2013 TR110 Water Monitoring Sampling and Frequency Update <br /> 2013 RN6 Permit Renewal #06 (RN-06) renew permit for five years <br /> 2014 SL14 Phase I bond release of 417.8 acres of parcels in A, F, Z and K Pits. <br /> Reduction in liability of$2,068,397.69. <br /> 2014 SL15 Phase I bond release of 120.4 acres in A, Z and K pits . Reduction <br /> in liability of$520,670.46. <br /> 2015 SL16 Phase II bond release of 277.8 acres in the A, F, K and Z pits. <br /> Reduction in liability of$376,228.82. <br /> 2015 PR7, increase in permit area of 774.39 acres and increase in affected area <br /> of 5 8.10 acres, updated mining and reclamation plan for 2012-2017 <br /> permit term and resulted in a reduction in liability of$4,014,314.80. <br /> 2016 TR115, POMT and Mine Plan updates, added 49.70 acres of affected land <br /> and increased liability b $379,501.44. <br /> 2016 SL17, Phase III bond release of 448.40 acres. Reduced liability by <br /> $696,737.41. <br /> 2018 RN7, renewal of the permit for another five year permit term. Reduction <br /> in liability of$879,386.29. <br /> MT8_Trapper Midterm 2020 Findings JLE.docx Page 4 <br />