Laserfiche WebLink
Page 12 <br /> Minor Revision MR-225 will be submitted concurrently with this permit application in order to <br /> facilitate the construction of three new groundwater monitor wells into the First, Second and <br /> Third White Sandstone aquifers down dip of I and J Pits mining activity. <br /> The following revised permit text pages are enclosed and updated as follows: <br /> • i-5. Page number changes <br /> • i-6. Page number changes <br /> • i-13. Page number changes <br /> • 2-462o. New section. I/J Pits aquifer characteristics discussion. <br /> • 2-520yy to 2-520zz. New section. VJ Pits groundwater quality discussion. <br /> • 2-523aa. New section. I/J Pits groundwater levels. <br /> • 2-524. Groundwater use discussion updated. <br /> • 2-524i. New section. I/J Pits groundwater use discussion. <br /> • 3-15 to 3-15a. Update I/J Pits mining sequence narrative. <br /> • 3-15b. I/J Pits highwall mining discussion included. <br /> • 3-15c. I/J Pits temporary spoil dump discussion included. <br /> • 3-44. I/J Pits boxcut discussion included. <br /> • 4-4. Discussion of I/J Pits Cropland vs. Range Site C post-mining land use. <br /> • 4-226a. Drawdown calculations and discussion added for I and J Pits mining impacts. <br /> • 4-226b. Last paragraph on page removed and placed at the top of page 4-226c. Potential <br /> impacts to wells from I and J Pits mining added. <br /> • 4-226c. Discussion from page 4-226b continued. <br /> • 4-226d. Pit by pit discussion of current permit term groundwater inflow reformatted on <br /> this page. <br /> • 4-226e. I/J pit discussion of groundwater inflow added to this page. Groundwater <br /> drawdown predictions also on this page. <br /> • 4-226f. Groundwater drawdown predictions, including for I/J Pits, continue on this page. <br /> Also, impacts to adjudicated wells is updated to include I/J Pits. <br /> • 4-177 (Table 4.8-3). Diversion ditch table updated to reflect future I/J Pits diversion <br /> ditches. <br /> The following additions to Appendices are enclosed: <br /> • Appendix A. Supplemental addendum to bond calculations currently in App A. <br /> • Appendix Q. I and J Pits diversion ditch design backup is added to Section XVII. <br /> The following revised maps are enclosed: <br /> • M6. Sheet 1 of this three set Worst Case Bond revised to include I/J Pits. <br /> • M9. Sheet 1 of this three set Haulroads Map is updated. <br /> • M10A. Sheet 1 of this three set Mining and Regrade Map is updated. <br /> • MIOB. Sheet 1 of this three set Topsoil Stripping and Reclaim Map is updated. <br /> • M12. Sheet 1 of this three set Postmining Topography Map is updated. <br /> • M14. This Drainage Profiles Map is updated in line with changes to Map M12. <br /> • M14A. I/J Pits Pre and post-mining profiles are updated in line with changes to Map <br /> M12. <br />