Laserfiche WebLink
Mr. Steve Hinkemeyer <br /> May 26, 2020 <br /> Page 10 <br /> • Lastly, given the placement location of the spoil pile atop the overburden above the J-Pit <br /> highwall mining zones, the surcharge from the existing spoils should be considered in <br /> designing the J-Pit highwall mining panels. The spoils pile, in its currently proposed form, <br /> is far enough from the crest of either pit to avoid affecting their highwall slope stability. <br /> Sincerely, <br /> Samrat Mohanty <br /> Sr. Associate <br /> smohanty@agapito.com <br /> SM/TV:klg <br /> Transmitted as a PDF via e-mail <br /> Agapito Associates, Inc. <br />