My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-08_REVISION - C1994082 (30)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2020-06-08_REVISION - C1994082 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:39:53 PM
Creation date
6/11/2020 5:51:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
6/8/2020
Doc Name Note
Phase II Bond Release Request Narrative
Doc Name
Initial Application Materials
From
Seneca Property, LLC
To
DRMS
Type & Sequence
SL8
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division's current calculated reclamation liability is $1,379,988.51. SPL has posted a <br /> Financial Warranty Corporate Surety issued by Lexon Insurance Company in the amount of <br /> $1,379,988.51 effective March 14th, 2018. <br /> MAP DESCRIPTION <br /> Map 1 - Phase II Bond Release SL-8 Area Delineation Map. This map shows all requested <br /> Phase II areas. <br /> Map 2 — Yoast Mine Permanent Features Map. This map shows permanent features <br /> documented in the mine permit. <br /> Map 3 — Phase II Bond Release SL-8 General Location Map. This map shows the general <br /> location of the Yoast Mine property boundaries relative to other land marks. <br /> BOND RELEASE DOCUMENTATION <br /> This application represents a formal request for partial Phase 11 Bond Release on 193 acres, (BRB- <br /> 2a and BRB-3) of reclaimed lands at the Yoast Mine (see Map 1). These reclaimed lands comply <br /> with applicable success and demonstration criteria set forth in Rule 4 — Performance Standards <br /> and the approved Yoast permit. <br /> SUMMARY OF RECLAMATION AND MANAGEMENT HISTORY <br /> PHASE II RELEASE AREAS <br /> Map 1 breaks the requested Phase II area down into parcels which are then identified by numbers <br /> relating them to the provided table on the map detailing the parcel history. Backfilling and re- <br /> grading of the Yoast Mine took place between 1997 and 2007, generally being completed within <br /> 180 days following the coal removal. The Phase II SL-8 requested areas were seeded between <br /> 2007 and 2013. All areas have been reclaimed in accordance to the permitted reclamation plan and <br /> approved post-mining land use. Topsoil replacement details can be found within the SL-3 bond <br /> release document. While the exact dates of topsoil replacement are not known, it can be logical to <br /> assume that topsoil replacement occurred within the same year as revegetation. Revegetation dates <br /> are shown on Exhibit B, Chronological Revegetation. <br /> SL-8 - 4 <br />