Laserfiche WebLink
<br />West Elk Mine <br /> <br />1.0 INTRODUCTION <br /> <br />Mountain Coal Company, LLC (MCC) operates West Elk Mine, an underground coal mine, on <br />Federal and fee coal leases located in Gunnison and Delta Counties, Colorado, two miles east of <br />Somerset, Colorado (Figure 1). The lease block locations are shown on Map 1. The lease blocks <br />are in Townships 13 and 14 South, Ranges 90 and 91 West, 6th PM. Mountain Coal Company, <br />LLC, a Delaware Limited Liability Company established in March 1998, is owned 100% by Arch <br />Western Bituminous Group, LLC, which is owned 100% by Arch Western Resources, LLC. Arch <br />Western Resources, LLC is owned 99.5% by Arch Western Acquisition Corporation and 0.5% by <br />Arch Western Acquisition, LLC, which is owned 100% by Arch Western Acquisition Corporation. <br />Arch Western Acquisition Corporation is owned 100% by Arch Resources, Inc. (formerly known as <br />Arch Coal, Inc.) <br /> <br />Operations at West Elk Mine have been conducted under several different names in the past. <br />Before 1991, West Elk Mine itself was known as the Mt. Gunnison No.1 Mine. Since the mine <br />opened, operations were conducted under the following names: Anaconda Minerals Company, <br />ARCO Coal Company (a Division of Atlantic Richfield Company), West Elk Coal Company, Inc., <br />Arch Coal, Inc. and Mountain Coal Company. Many of the discussions, maps and exhibits included <br />in this document still reflect the other mine and company names. All the names are to be considered <br />synonymous with West Elk Mine and Mountain Coal Company, LLC. <br /> <br />When the original permit document was prepared, operations focused in the F Seam. However, <br />references to the F Seam resources and facilities throughout this application may also apply to the E <br />and B Seam resources and facilities. <br /> <br />Construction of West Elk Mine began in 1981. The mine began producing coal from the F Seam in <br />January 1982 from the B Seam in 1990, and from the E Seam in 2004. Construction of facilities has <br />been on-going to meet production needs. <br /> <br />Construction of the Sylvester Gulch Facilities Area, including two ventilation shafts, two mine <br />ventilation fans, a new electrical substation, new and upgraded roads, powerlines and support <br />facilities, began in the Spring of 1997. These facilities provide the increased power, access, and <br />ventilation requirements necessary to sustain underground mining operations. <br /> <br />West Elk Mine was originally envisioned to grow to 2.8 million tons per year production from the <br />F-Seam room and pillar operations. Soft market conditions slowed this expansion during the late <br />1980's and the mine produced approximately 0.5 million tons per year from the F Seam room and <br />pillar operations during this term. After longwall operations were established in the B Seam in <br />1992, production increased to over 1.4 million tons per year and is expected to reach 8.2 million <br />tons of clean coal per year. <br /> <br />To allow MCC to remain competitive under current market conditions, expansion into the E and B <br />Seams, was completed. These seams have high productivity capabilities with longwall technology. <br />Room and Pillar mining operations with continuous miners cannot compete with longwall mining <br />operations. Coal height and other conditions in the F Seam are not conducive to longwall mining. <br />The E and B Seams are, however, well suited to longwall mining methods. <br />1.0-1 Rev. 11/04- PR10; 05/20-MR445 <br /> <br />