Laserfiche WebLink
a <br /> c. section 34-32.5-124, C.R.S.by failing to comply with the conditions of <br /> Reclamation Permit number M-1999-058. <br /> 4. Pursuant to section 34-32-124(7).C.R.S.,any person who violates any <br /> provision of a permit shall be subject to a civil penalty of not lass than one hundred <br /> dollars($100)nor more than one thousand dollars($1,000)per day for each day each <br /> violation occurs. <br /> ORDER <br /> 5. The Board finds CSQ in violation of section 34-32.5-116(4)(d),C.R.S.for <br /> the unauthorized release of pollutants to groundwater,section 34-32.5-116(4)(h),C.R.S. <br /> for failure to minimize disturbance to the prevailing hydrologic balance with regards to <br /> water quality;and section 34-32.5-124,C.R.S.for failure to comply with the conditions <br /> of Reclamation Permit number M-1999-058. <br /> 6. The Board orders that CSQ,as agreed In paragraph 20 of the Agreement, <br /> shall continue its efforts to prevent migration of fuel from the quarry site and to protect <br /> ground and surface water systems by completing the following corrective action, <br /> a. Implement and complete the mitigation and monitoring plans CSQ <br /> previously proposed and provided to the Division in regard to the remediation of <br /> dlesel-contaminated fill material for and protection of ground and surface water <br /> systems. Such activities Include the Bloremediation Treatment Plan,which is <br /> appendix F to the October 11 th, 2019 Diesel Spit)Report,dated November 27, <br /> 2019 and prepared by Greg Lewidd and Associates,PLLC,and the groundwater <br /> and surface water sampling and analysis plans prepared by HRL Compliance <br /> Solutions, Inc., all of which have been previously provided to the Division. Those <br /> plans shall be submitted to the Division as a Technical Revision within sixty days <br /> of when this Order is mailed. <br /> 1. The Board orders,and the parties agree that,pursuant to section 34-32- <br /> 124(7), C.R.S.,Colorado Stone Quarries is hereby assessed a civil penalty in the total <br /> amount of$18,600,as reflected in paragraph 22 of the Agreement. <br /> DONE AND ORDERED this alb day of may 2020. <br /> FOR THE COLORADO MINED LAND <br /> RECLAMATION BOARD <br /> Joh Singletary,Chair <br /> Colorado Stone Quarries,Inc. <br /> Pride of America MinW-19W058 <br /> MV-2020-006 2 <br />