My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-09_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2020-06-09_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 10:43:27 AM
Creation date
6/9/2020 10:09:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
6/9/2020
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company L.P.
Inspection Date
6/4/2020
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 4, 2020 C-1981-019/Colowyo Coal Mine ZTT <br />occurring. Collom diches D-1, 2, 3, and D-6 ditches were inspected. All the ditches were dry and stable and no <br />issues were observed. <br />An upper portion of the Taylor Tributary Ditch was constructed in the fall of 2019. This portion of the ditch was <br />inspected. The ditch was well graded with a trapezoidal design and well armored with rip rap. No issues of erosion <br />or cutting was observed and the new section of the Taylor Tributary Ditch was functional. <br />Most of the ponds at the Colowyo Mine were inspected. This included the Prospect, Streeter, Work Area, Stoker <br />Siding, Gossard, Rail Loop, Section 36, Middle, Section 25, Sidehill and Section 26 Ponds. Most ponds held <br />minimal water with no discharge. All pond embankments were stable and spillways were in functioning order with <br />no issues observed. <br />Sediment fence was inspected throughout the site, specifically the areas associated with the Collom Pit. All <br />observed silt fencing was stable and in working order. No sediment was observed leaving the site and all fences <br />inspected were working as intended. <br />New section of Taylor Tributary Ditch. <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Final East Pit Ditch and stock tank PD2. <br />Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.