Laserfiche WebLink
Table 2 <br /> OPERATIONAL LOSSES <br /> Fremont Paving & Redi-Mix- Pueblo East Pit <br /> 2020 Plan Year <br /> (1) (2) (3) (4) <br /> Plan Year Amount of Water Lost Water Used Total <br /> 2020 Aggregate With Mined for Dust Operational <br /> Month Production Aggregate Control Losses <br /> (tons) (acre-feet) (acre-feet) (acre-feet) <br /> April-20 25,000 0.736 1.00 1.74 <br /> May 25,000 0.736 1.00 1.74 <br /> June 25,000 0.736 1.00 1.74 <br /> July 301000 0.883 1.00 1.88 <br /> August 30,000 0.883 1.00 1.88 <br /> September 251000 0.736 1.00 1.74 <br /> October 25,000 0.736 1.00 1.74 <br /> November 255000 0.736 1.00 1.74 <br /> December-20 25,000 0.736 1.00 1.74 <br /> January-21 251000 0.736 1.00 1.74 <br /> February 25,000 0.736 1.00 1.74 <br /> March 251000 0.736 1.00 1.74 <br /> Total 310,00D 9.12 12.00 21.12 <br /> Notes: <br /> (1) Projected mining provided by Fremont Paving&Redi-Mix. <br /> (2) Column(2)times 2000 times 4%divided by 62.4 divided by 43,560. <br /> (3) Projected dust control provided by Fremont Paving&Redi-Mix. <br /> (4) Equals the sum of Columns(2)and(3). <br /> ❑eere&Ault Consultants,Inc. 2020 Pueblo East Pit 5W5P Tables(Prof) <br />