My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-02_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2020-06-02_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:07:05 PM
Creation date
6/3/2020 1:03:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
6/2/2020
Doc Name
Concurrence Correspondence
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR29
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. DRMS Comment <br /> The As-Built Drawings include the final 2019 surface elevations for the buttress material, <br /> however the drawings do not include details for the placement and as-built elevations for <br /> the filter material. Additionally, the as-built drawings eliminated many details for the 1.5 <br /> foot thick filter material and other construction details for the buttress project which were <br /> included on the original construction drawings. Please explain these discrepancies and <br /> revise the as-built drawings accordingly. <br /> Henderson Response <br /> Because the filter material is blanketed across the pre-construction topography, there is <br /> not a specific elevation that can be referenced. The filter material was placed in two 9-inch <br /> lifts prior to buttress construction. An additional as built drawing, sheet 2, was created to <br /> represent the filters extent and details added for the two 9-inch lifts. The channel and drain <br /> extensions from the 2018 work have also been included on sheet 7. Please see <br /> attachment 1 for the updated set of as-built drawings. <br /> If you have any additional questions, concerns or require more information regarding this project, <br /> please feel free to contact me at (720) 942-3480 or Miguel Hamarat at (720) 942-3255. <br /> Regards, <br /> Amber Parmet <br /> Senior Environmental Engineer <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> Attachments: <br /> 1. Revised 3 Dam Phase I As-Built Drawings <br /> cc: M. Hamarat (CMC), email <br /> A. Hilshorst (CMC), email <br />
The URL can be used to link to this page
Your browser does not support the video tag.