Laserfiche WebLink
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining)land use(check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture (GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) r7l Industrial/Commercial(IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Waste rock will be removed and original grade reestablished <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): H: V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV(example 1 H:1 V, 2H: IV, etc.),please <br /> include a justification: <br /> We will match existing grades <br /> a. Please provide a general description of the backfilling and grading: <br /> Grading will occur after waste rock is removed <br /> 4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br /> 4-6 inches 6-8 inches <br /> 8-10inches 10-12inches <br /> Other: <br /> N/A, explain: Wewilloere gaste Feel(expesing original soil. Regrading as needing-- <br />