My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-27_REVISION - M1987164
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987164
>
2020-05-27_REVISION - M1987164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2025 6:54:09 AM
Creation date
5/28/2020 1:34:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987164
IBM Index Class Name
REVISION
Doc Date
5/27/2020
Doc Name
Request For Amendment To Permit
From
Oldcastle SW Group, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
TNL
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L RECLAMATION COSTS <br /> The worst case of reclamation is when mining has completed in the Phase 1 and 2 areas on the <br /> eastern half of the permit area. The Camilletti Pit area (western half) has already been topsoiled <br /> and revegetated as of 2017. The reclamation tasks breakdown as follows: <br /> 1. Demolition of asphalt plant and support facilities. <br /> 2. Transport backfill material to highwalls in Phase 3 area. <br /> 3. Establish 3H:1 V slopes in Phase 3 area. <br /> 4. Grade stockpiles. <br /> 5. Rip pit floor in Phase 2 and 3 area; Transport topsoil from stockpiles; Distribute topsoil. <br /> 6. Revegetate disturbed areas. <br /> 7. Mobilization. <br /> Costs for these reclamation tasks are based on bond calculations conducted by the Division in <br /> 2016, prior to the completion of Camilletti revegetation, and are shown in Table L-1. <br /> Table L-1 - Reclamation Task and Cost Estimate <br /> Activity Description <br /> •Demolition of asphalt plant and support facilities 1 <br /> 32000 <br /> Transport backfill material to highwalls in Phase 3 area. 2 7000 <br /> Establish 3H:1V slopes in Phase 3 area. V 3 3000 <br /> Grade stockpiles. 0.5 4900 <br /> Rip pit floor in Phase 2 and 3 area;Transport topsoil from stockpiles;Distribute topsoil. 1 60400 <br /> Revegetate disturbed areas. 0.5 20000 <br /> Mobilization. 2 6500 <br /> Subtotal $133,800 <br /> DRMS Costs(28 percent x direct costs) $37,464 <br /> i Total Bond Amount 8.5 $171,264 <br /> Hayden Gravel Pit L_1 Greg I.ewkki and As isles,PIA A' <br /> May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.