Laserfiche WebLink
Table 1 <br /> Castle Concrete Aggregates-Grisenti Pit <br /> 2-Year Projected Depletions from Mining Operations <br /> Dust Reclamation Exposed Water Surface First-Fill of Total Unlagged Total Lagged <br /> Production Control Irrigation Use Exposed Ground Depletion Depletion <br /> Mined Water Gross Total Effective Net Water Area Net Evaporation volume Phase 2 from Mining from Mining <br /> Material Consumed Phase 1 Phase 2 Evaporation Precipitation Precipitation Evaporation Phase 1 Phase 2 Phase 1 Phase 2 Total �nlagged Operation Operation <br /> (x 1000 tons) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ft) (ft) (ft) (ft) (acres) (acres) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) <br /> Month [1] [2] [3] [4a] [4h] [5] [6] [7] [8] [9a] [9b] [10a] [1 Ob] [1 Oc] [11] [12] [13] <br /> Apr-20 0.00 0.00 0.29 0.00 0.00 0.34 0.11 0.08 0.26 24.0 22.1 6.25 5.75 12.00 19.81 32.10 30.11 <br /> May-20 0.00 0.00 0.30 1.11 3.89 0.45 0.13 0.09 0.36 24.0 22.7 8.66 8.19 16.85 24.89 47.04 42.46 <br /> Jun-20 0.00 0.00 0.29 1.11 3.89 0.55 0.10 0.07 0.49 24.0 23.3 11.66 11.32 22.98 27.96 56.22 53.15 <br /> Jul-20 0.00 0.00 0.30 1.11 3.89 0.57 0.15 0.11 0.46 24.0 24.1 11.11 11.15 22.26 28.79 56.35 56.26 <br /> Aug-20 0.00 0.00 0.30 1.11 3.89 0.51 0.16 0.11 0.40 24.0 24.7 9.50 9.78 19.27 19.71 44.28 47.67 <br /> Sep-20 0.00 0.00 0.29 1.11 3.89 0.38 0.09 0.06 0.32 24.0 25.1 7.65 8.01 15.66 12.46 33.40 36.59 <br /> Oct-20 0.00 0.00 0.30 1.11 3.89 0.26 0.07 0.05 0.21 24.0 25.3 5.07 5.34 10.41 10.16 25.87 28.36 <br /> Nov-20 0.00 0.00 0.29 0.00 0.00 0.15 0.06 0.04 0.11 24.0 25.6 2.61 2.79 5.40 10.16 15.85 19.18 <br /> Dec-20 0.00 0.00 0.30 0.00 0.00 0.11 0.04 0.03 0.08 24.0 25.8 2.02 2.17 4.19 10.35 14.83 15.39 <br /> Jan-21 0.00 0.00 0.30 0.00 0.00 0.11 0.03 0.02 0.09 24.0 26.0 2.10 2.28 4.38 7.81 12.48 13.09 <br /> Feb-21 0.00 0.00 0.27 0.00 0.00 0.13 0.04 0.03 0.10 24.0 26.2 2.51 2.74 5.26 5.20 10.73 11.09 <br /> Mar-21 0.00 0.00 0.30 0.00 0.00 0.21 0.08 0.06 0.15 24.0 26.4 3.69 4.06 7.75 1 7.87 15.93 14.37 <br /> 20-21 Total 0.00 0.00 3.50 6.67 23.33 3.78 1.06 0.74 3.03 - - 72.84 73.58 146.42 185.16 365.08 367.73 <br /> Apr-21 0.00 0.00 0.29 0.00 0.00 0.34 0.11 0.08 0.26 24.0 26.6 6.25 6.93 13.17 8.01 21.47 19.53 <br /> May-21 0.00 0.00 0.30 1.11 3.89 0.45 0.13 0.09 0.36 24.0 26.8 8.66 9.67 18.33 8.01 31.64 28.27 <br /> Jun-21 0.00 0.00 0.29 1.11 3.89 0.55 0.10 0.07 0.49 24.0 27.1 11.66 13.17 24.83 8.01 38.12 35.74 <br /> Jul-21 0.00 0.00 0.30 1.11 3.89 0.57 0.15 0.11 0.46 24.0 27.1 11.11 12.54 23.65 0.00 28.95 31.22 <br /> Aug-21 0.00 0.00 0.30 1.11 3.89 0.51 0.16 0.11 0.40 24.0 27.1 9.50 10.73 20.22 0.00 25.52 26.72 <br /> Sep-21 0.00 0.00 0.29 1.11 3.89 0.38 0.09 0.06 0.32 24.0 27.1 7.65 8.64 16.30 0.00 21.59 23.01 <br /> Oct-21 0.00 0.00 0.30 1.11 3.89 0.26 0.07 0.05 0.21 24.0 27.1 5.07 5.72 10.79 0.00 16.09 18.06 <br /> Nov-21 0.00 0.00 0.29 0.00 0.00 0.15 0.06 0.04 0.11 24.0 27.1 2.61 2.95 5.56 0.00 5.85 9.24 <br /> Dec-21 0.00 0.00 0.30 0.00 0.00 0.11 0.04 0.03 0.08 24.0 27.1 2.02 2.28 4.30 0.00 4.60 5.22 <br /> Jan-22 0.00 0.00 0.30 0.00 0.00 0.11 0.03 0.02 0.09 24.0 27.1 2.10 2.37 4.47 0.00 4.77 4.74 <br /> Feb-22 0.00 0.00 0.27 0.00 0.00 0.13 0.04 0.03 0.10 24.0 27.1 2.51 2.84 5.35 0.00 5.62 5.32 <br /> Mar-22 0.00 0.00 0.30 0.00 0.00 0.21 0.08 0.06 0.15 24.0 27.1 3.69 4.17 7.86 1 0.00 8.16 7.28 <br /> 21-22 Total 0.00 0.00 3.50 6.67 23.33 3.78 1.06 0.74 3.03 - - 72.84 82.01 154.84 24.03 212.37 214.34 <br /> Notes: <br /> penoc <br /> z2lercdw'r-_ - �- _ <br /> '_--_7' <br /> uve mhnn-a has com[3] Dust control projections based upon historical maximum annual dust control uses,distributed uniformly through the year.Actual monthly dust control amounts may vary. <br /> [4a],[4b]Reclamation irrigation use at Phases 1 and 2. <br /> [5] Based upon NOAA Evaporation Atlas(45.4 inches per year),distributed monthly based upon State's SB-120 guidelines. <br /> [6] Based upon average monthly precipitation data from the NOAA Climate Data(Canon City,1950-2003). <br /> [7] Effective Precipitation equals 70 percent of total precipitation,based upon the State's SB-120 guidelines,[6]*0.70. <br /> [8] Net Evaporation equals Gross Evaporation less Effective Precipitation,[5]-[7]. <br /> [9a],[9b] Projected exposed area at Phases 1 and 2 Total maximum exposed water surface area that may occur at Grisenti Pit during the plan period is 51 acres. Projected amounts based on estimated timing and infiltration <br /> rates for the first-fill operations. <br /> [10a],[1Ob],[10c] Equals[8]*[9a]for Phase 1 and[8]*[9b]for Phase 2.Total net evaporation equal to[10a]+[1 Ob]. <br /> [11]Total first-fill inflows to Phase 2 pit during the month.Projected amounts based on estimated timing and infiltration rates for the first-fill operations. <br /> [12] Total Unlagged Depletion from Mining Operation equals[2]+[3]+[4a]+[4b]+[1 Oc]+[11].Amount conservatively assumes first-fill occurs by groundwater infiltration only. <br /> [13] Total Lagged Depletions from Mining Operation are lagged using URF factors for each mining area,developed in IDS-AAS employing the glover method.The IDS-AAS inputs are provided in the 2020 SSP <br /> renewal request. <br /> ^�,BBA <br /> t- r 4 t f A INC. Printed On:4/16/2020 PJB <br />