My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_PERMIT FILE - M2020029
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020029
>
2020-05-26_PERMIT FILE - M2020029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 8:31:54 AM
Creation date
5/27/2020 1:55:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020029
IBM Index Class Name
PERMIT FILE
Doc Date
5/26/2020
Doc Name
Application
From
Kiewit Infrastructure
To
DRMS
Email Name
DC1
MAC
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• North on CR 23, then around the LG Everist site using LG Everist's existing roads north to CR <br /> 126. <br /> • Southeast on County Road 23 to CR 120. <br /> Also as shown on Sheet C-1, the area within 300' each side of Lone Tree Creek will not be mined. This <br /> area shall remain as is and be protected with no equipment or vehicular entry as there are environmental <br /> sensitivities within that boundary. The only exception will be a potential crossing for use in accessing the <br /> east side of the property. This location is shown for reference in Sheet C-1; the final location will be <br /> determined during mining operations and could be changed if deemed beneficial to the mining process.The <br /> creek will be bridged with an elliptical culvert so as not to impede passage by aquatic species. In the <br /> alternative, Kiewit may access the east side of the property through the northern boundary; if used, this <br /> access will be negotiated with the neighboring property owner. <br /> The sorting, crushing, stockpiling, loading and all processing equipment will be initially set up on cell 3 <br /> until cell 3 is to be mined. At that time the sorting, crushing, stockpiling, loading and all processing <br /> equipment will be moved to cell 13. When all other cells to be mined are exhausted the sorting, crushing, <br /> stockpiling, loading and all processing equipment will be move one final time to cell 6. Upon exhaustion <br /> of cell 13 that cell will be reclaimed as outlined in Exhibit E and final decommissioning of the site will <br /> begin. <br /> See Sheet C-2 for the mining plan map with the anticipated topography during mining. Contours for Cells <br /> 1 through 3 were derived based on the depth of the resource as determined in the Terracon report. Contours <br /> for Cells 4 through 13 were derived assuming the cells would be mined to depth of 12' BSG; the actual <br /> depth of mining will vary depending on the depth of the resource encountered in these cells. All headwalls <br /> are sloped 1 H:1 V as proposed in this mining plan. <br /> Kiewit <br /> DRMS 112 Permit Application <br /> Page D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.