Laserfiche WebLink
-4- <br /> 12. Primary future Post-minin land use check one): <br /> 1W Cropland(CR) F Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) F Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) E Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use check one : <br /> ElCropland(CR) Pastureland(PL) General Agriculture(GA) <br /> n Rangeland(RL) -H Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) El Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Minine: Briefly explain mining method(e.g.truck/shovel): <br /> excavator, loader, or dozer will push material into a stockpile, a haul truck may be used to take material to the crusher <br /> 15. On Site Processing: Z Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Pit run will be sent through the crusher to generate construction materials and surface gravel <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> The amended area will be mined in the same manner as in items 14 and 15 above. Of the <br /> 119.94 acres being added, approximately 77.75 acres will be mined. The remaining acreage <br /> Fnay be used f8F tepseil steel(piling eF will be left unmined. A new eeeess peint will be Utilized te <br /> access the new acreage so the landowner can have the existing access to the mined area for <br /> arming purposes. <br />