Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil is estimated at 3" deep across pad location. Disturbed topsoil will be stockpiled <br /> along pad and re-spead over pad once drilling operations have ceased. Approximate <br /> topsoil volume is (25'x50'x_25')=312.5Ft^3 <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Holes will be cement grouted and capped. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> N/A <br /> Form 2—Public File Page 9 of 14 <br />