Laserfiche WebLink
EXHIB T <br /> =�"IDA'�tT <br /> OF RICK PARSONS 9 <br /> STATE OF OREGoN <br /> r <br /> C01'N7 Y OF <br /> The undersigried,Rick Parsons, is the <br /> (`ParsonsWatr„),,which located at T6P principal of ParsonsWatet Consulting, LLC <br /> F`arsuns�Vater is a wa,tez resources and water�tRengineering co OR <br /> ny spec. <br /> 9750I. <br /> surface water and ground Amer hydrology water resources ►management and water rilwhts <br /> lalizing in <br /> engineering. <br /> The undersigned certifies the Following. <br /> I. I am the founder and manager of Parsons''��ater and am a licensed professional <br /> ngi g Colorado and <br /> engineering have practiced water resources management and <br /> e Colorado and the intermountain west for a rox <br /> - The.amended Use by Special �ev1e�- PP imate$-2 }'car5. <br /> application should not be (�iinin€, Operation) (2NeliuSRl9-o14-766p) <br /> Broken Arrow) ism approved unless Broken Arrow In�•esr<nncnts, LLC <br /> required to take sufficient actions to minimize the impart of <br /> mining an surface and ground water drainage and ground water resources in the <br /> ate surrounding the mine. <br /> J. Broken Arrow claims the majority of storm <br /> site on the north side of its ra rtti runoff on its <br /> pt° comes i-o�n off- <br /> ge P <br /> Consulting, Inc. October 2018) but has(no out n 'a and Report. Der: Pit. .1RT <br /> of up to 80 cfs will not back hose starmwater inlloivs <br /> to the north of the mine. on and damage the PrapertY of land holders located <br /> 4. Broken Arrow acknowledges <br /> mine site mining <br /> (nRA4S Ad wiil affect the water table surrounding the <br /> Adequacy Retizew No. 1, Exhibit E. J&:T Consulting, Inc. June <br /> S_2018?. but does not appear to have addressed those effects as pan of'its businessoperations. <br /> 5- 13roken Arrow,proposes Water levels be marti <br /> and o tared at on-site wells before_ durine <br /> s after the mining and reclarmat.io 1 is cornplete so that impacts to the Soarer gable <br /> and damages to neighbors, well from tnirtinr� vPeration can be identified and <br /> addressed. <br /> h• Slurry walls are constructed around minim¢ cells to reduce the impact of minims <br /> opemtioas to ground water resources surrounding the route.;1'o slurry wall has been <br /> installed around the current Derr Pit mine area, <br /> 7. Broken Am��c claims it wants to"operate _ <br /> pm,a i s.the current Derr Pit mine have gonerY a a consequence of tsus ls tm <br /> op�ons. <br /> 8- Broken Arrow Proposes to install a <br /> impacts tinm nninin perirrretcr drain to rrritigate P'aund wafer <br /> g should Alter lek-els van,- 3 feet from historical levels. The <br /> limited data available from Broken Arrow indicate variations in excess of I0 feet <br /> in and around the existing mine but no pexirneter <br /> area. drain, has been installed in that <br /> 1 j <br />