Laserfiche WebLink
May 20, 2020 C-2010-089/New Horizon North Mine LJW <br />95 <br />—j�Aoe <br />' { <br />y., <br />.. ,.5 ., i r. � w� k •fir <br />_ Photo Three: View norths, showing the labeled topsoil stockpile that was used to <br />backfill the facilities area. The pile needs to be reshaped to match the approved <br />design in the permit, but was stable at the time of the inspection. <br />Photo Four: View northeast, showing the area where the topsoil was removed from the <br />pile. According to the Operator's representative reshaping and seeding of the stockpile <br />will take place in the coming weeks. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 5 of 5 <br />