Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Reclamation tasks remaining after SL10 (partial PII rel) <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 5/20/2020 County: Weld Filename: CO28-000 <br />User: JHB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />A01 <br />A03 <br />A04 <br />A05 <br />CO2 <br />C05 <br />E01 <br />E02 <br />E03 <br />E05 <br />FO1 <br />F01a <br />GO1 <br />HO1 <br />I01 <br />IO2 <br />JO1 <br />Backfill B -Pit <br />SCRAPERI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />141.15 <br />$295,050 <br />$4,304 <br />$3,089 <br />$1,064 <br />$1,885 <br />$494 <br />$114,072 <br />$188,532 <br />$16,136 <br />$30,644 <br />$100,877 <br />$14,851 <br />$3,673 <br />$7,635 <br />$772 <br />$27,642 <br />$35,916 <br />Final Grade Long -Term Spoil Area <br />GRADER <br />25.98 <br />Final Grade Topsoil Stockpile Area and Parcel 34 <br />Topsoil <br />GRADER <br />17.75 <br />Final Grade "Other Areas" (parcels 42 and 43) <br />GRADER <br />6.11 <br />Rip 10,480 feet of internal roads <br />RIPPER <br />6.49 <br />Regrade Internal Roads <br />GRADER <br />2.90 <br />Topsoil B -Pit (PII release Parcle 31,32,& 33) <br />SCRAPERI <br />4838 <br />Topsoil Long Term Spoil Area and Parcel 25 <br />SCRAPERI <br />77.41 <br />Haul topsoil to "Other Areas" (parcel 42 and 43) <br />SCRAPERI <br />11.06 <br />Haul topsoil to interior access roads <br />SCRAPERI <br />21.01 <br />Seed 152.49 acres of disturbed area. (no PII bond <br />rel) <br />REVEGE <br />70.00 <br />Seed 29.82 acres Phase II release (parcels <br />31,32,33) <br />REVEGE <br />15.00 <br />Structural demolition <br />DEMOLISH <br />8.00 <br />Seal 7 wells <br />BOREHOLE <br />16.00 <br />Clean sediment from Pond 2, dispose in B -Pit <br />TRUCKI <br />1.38 <br />water monitoring <br />SITEMAINT <br />ENANCE <br />30.00 <br />Mobilization and Demobilization of Equipment <br />MOBILIZE <br />15.60 <br />SUBTOTALS: <br />514.22 <br />$846,636 <br />INDIRECT COSTS <br />$17,102 <br />OVERHEAD AND PROFIT: <br />$8,890 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />257.11 <br />Profit: <br />10.00 <br />Total = <br />$17,102 <br />Total = <br />$8,890 <br />Total = <br />$17,841 <br />Total = <br />$84,664 <br />TOTAL O & P = <br />$128,496 <br />CONTRACT AMOUNT (direct + O & P) _ <br />$975,132 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): $500 <br />Engineering work and/or contract/bid preparation: 6.00 <br />Reclamation management and/or administration: 4.50 <br />CONTINGENCY: 0.00 <br />Total = $500 <br />Total = $58,508 <br />$43,881 <br />Total = $0 <br />