Laserfiche WebLink
Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />3400.00 <br />1.00 <br />3.00 <br />4.00 <br />2665 <br />1.439 <br />Haul Time: 1.439 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />Production 425.03 <br />1 <br />3400.00 <br />-1.00 <br />3.00 <br />2.00 <br />2905 <br />1.205 <br />127.43 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Return Time: 1.205 <br />minutes <br />Total Truck Cycle Time: 5.548 <br />minutes <br />Loading Tool unit <br />Production 425.03 <br />LCY/Hour Adjusted for job efficiency: <br />352.77 LCY/Hour <br />Truck Unit Production <br />153.53 <br />LCY/Hour Adjusted for job efficiency: <br />127.43 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 382.28 <br />LCY/Hour <br />Adjusted single truck/loader team production: 352.77 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 352.77 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 1.38 <br />Hours <br />Unit cost: $1.588 <br />/LCY Total job cost: $772 <br />