My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />3400.00 <br />1.00 <br />3.00 <br />4.00 <br />2665 <br />1.439 <br />Haul Time: 1.439 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />Production 425.03 <br />1 <br />3400.00 <br />-1.00 <br />3.00 <br />2.00 <br />2905 <br />1.205 <br />127.43 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Return Time: 1.205 <br />minutes <br />Total Truck Cycle Time: 5.548 <br />minutes <br />Loading Tool unit <br />Production 425.03 <br />LCY/Hour Adjusted for job efficiency: <br />352.77 LCY/Hour <br />Truck Unit Production <br />153.53 <br />LCY/Hour Adjusted for job efficiency: <br />127.43 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 382.28 <br />LCY/Hour <br />Adjusted single truck/loader team production: 352.77 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 352.77 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 1.38 <br />Hours <br />Unit cost: $1.588 <br />/LCY Total job cost: $772 <br />
The URL can be used to link to this page
Your browser does not support the video tag.