My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: Clean sediment from Pond 2, dispose in B -Pit <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining <br />PROJECT IDENTIFICATION <br />Task #: I01 State: Colorado <br />Date: 5/20/2020 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team -Truck: Generic 12-18 cy, 6x4 <br />-Loader: Cat 320D L 9'-6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker. 3.500 Gal. <br />Permit/Job#: C1981028 <br />Abbreviation: None <br />Filename: C28 -I01 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team SunnOrt Eauinment Maintenance Eauinment <br />Total work team cost/hour: $560.16 <br />MATERIAL OUANTITIES <br />Initial volume: 486 CCY Swell factor <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,400 Pounds/LCY <br />Description: Sand and gravel - Wet <br />Rated Payload: 50,300 Pounds <br />sediment <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$23.64 <br />$3731 <br />NA <br />NA <br />$64.10 <br />$13.51 <br />Operating cost/hour: <br />$49.15 <br />$40.45 <br />NA <br />NA <br />$14.04 <br />$7.24 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$24.79 <br />$45.39 <br />NA <br />NA <br />$45.39 <br />$0.00 <br />Unit Subtotals: <br />$97.58 <br />$123.14 <br />NA <br />NA <br />$123.53 <br />$20.75 <br />Number of Units: <br />3 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $415.88 <br />Support: $0.00 <br />Maint: $144.28 <br />Total work team cost/hour: $560.16 <br />MATERIAL OUANTITIES <br />Initial volume: 486 CCY Swell factor <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4" <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,400 Pounds/LCY <br />Description: Sand and gravel - Wet <br />Rated Payload: 50,300 Pounds <br />sediment <br />
The URL can be used to link to this page
Your browser does not support the video tag.