Laserfiche WebLink
DEMOLITION WORK <br />Task description: Structural demolition <br />Site: Keenesburg Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: GO1 <br />Date: 5/20/2020 <br />User: JHB <br />UNIT COSTS <br />Permit Action: SL 10 remaining Permit/Job#: C1981028 <br />State: Colorado <br />County: Weld <br />Agency or organization name: DBMS <br />Abbreviation: None <br />Filename: C28-GO1 <br />Location adjustment: 96.90 % <br />Structure or <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Item Description <br />Selection <br />Cost <br />Powder magazine <br />21'x 28'x <br />Bldg. (SN) <br />5,880.00 <br />CF <br />$0.19 <br />$1,105.44 <br />-cinder block <br />10'h <br />demo./on-site <br />walls <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Powder <br />21'x 28' <br />Demo_ and on-site <br />588.00 <br />SF <br />$0.60 <br />$352.09 <br />magazine- <br />disposal in existing <br />concrete floor <br />pit, 4 in. thick - <br />Max. 10,000 ft. haul <br />Skid mounted <br />28'x 26'x <br />Bldg. (SN) <br />13,104.00 <br />CF <br />$0.18 <br />$2,332.51 <br />garage <br />18'h <br />demo./on-site <br />disposal in existing <br />pit or cut - Max_ 50 <br />ft. push <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 8.00 (unadjusted): $3,790.04 location): $3,672.55 <br />