My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: CO2 State: Colorado <br />Date: 5/20/2020 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Ripper Attachment: 3 -Shank Ripper <br />Abbreviation: None <br />Filename: C28 -0O2 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />$121.49 NA <br />$105.84 100 <br />$13.94 NA <br />$8.96 100 <br />$39.98 NA <br />$29020 <br />$290.20 <br />Selected estimating method: Area <br />Ownership Cost/Hour: <br />NA <br />feet/second <br />Operating Cost/Hour: <br />Ripper Ownership Cost/flour: <br />1.50 <br />feet/pass <br />Ripper Operating Cost/Hour: <br />7.67 <br />feet/pass <br />Operator Cost/flour: <br />500.00 <br />feet/pass <br />Total Unit Cost/flour: <br />88.00 <br />feet/minute <br />Total Fleet Cost/Hour: <br />0.25 <br />minutes/pass <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: <br />Area: 4.80 acres Rip Depth (ft): <br />Source of estimated quantity: Permit <br />HOURLY PRODUCTION <br />Seismic: <br />NA <br />1.50 <br />BCY <br />Volume <br />NA <br />11.616 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />feet/pass <br />Average Ripping Width: <br />7.67 <br />feet/pass <br />Average Ripping Length: <br />500.00 <br />feet/pass <br />Average Dozer Speed: <br />88.00 <br />feet/minute <br />Average Maneuver Time: <br />0.25 <br />minutes/pass <br />Production per unit area: <br />0.891 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.891 <br />Acres/hr <br />Site Altitude: <br />4,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.74 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />6.49 <br />Unit cost: $392.625 Per acre <br />Total job cost: <br />$1,885 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.