Laserfiche WebLink
MOTOR GRADER WORK <br />Task description: Final Grade Long -Term Spoil Area <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining <br />PROJECT IDENTIFICATION <br />Task #: A03 State: Colorado <br />Date: 5/20/2020 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Permit/Job#: C1981028 <br />Abbreviation: None <br />Filename: C28A03 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Utilization % <br />Ownership Cost/Hour: <br />$64.10 <br />NA <br />Operating Cost/flour: <br />$56.17 <br />100 <br />Ripper Ownership Cost/Hour: <br />$0.00 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Unadjusted Hourly Unit Production: <br />Operator Cost/flour: <br />$45.39 <br />NA <br />Total Unit Cost/Hour: <br />$165.66 <br />Source <br />Total Fleet Cost/Hour: $165.66 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />42.94 <br />2018 ARR <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 4000 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.6527 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: 25.98 Hours <br />Unit cost: $100.23 per acre Total job cost: $4,304 <br />