My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-26_REVISION - C1981028 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2020-05-26_REVISION - C1981028 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:16:47 AM
Creation date
5/26/2020 11:54:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
5/26/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Coors Energy Company
Type & Sequence
SL10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Backfill B -Pit <br />Site: Keenesburg Strip Mine Permit Action: SL 10 remaining Permit/Job#: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: A01 State: Colorado <br />Date: 5/19/2020 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: A01 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauipment <br />Total work team cost/hour: $2,090.36 <br />MATERIAL QUANTITIES <br />Initial volume: 254,971 CCY Swell factor: 1.124 <br />Loose volume: 286,486 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$174.06 <br />NA <br />$121.49 <br />NA <br />$64.10 <br />$13.51 <br />Operating cost/hour: <br />$190.35 <br />NA <br />$105.84 <br />NA <br />$14.04 <br />$7.24 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Ripper op_ cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$45.58 <br />NA <br />$39.98 <br />NA <br />$45.39 <br />$38.86 <br />Unit Subtotals: <br />$409.98 <br />NA <br />$267.31 <br />NA <br />$123.53 <br />$59.60 <br />Number of Units: <br />4 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,639.92 <br />Support: <br />$267.31 <br />Maint: <br />$183.13 <br />Total work team cost/hour: $2,090.36 <br />MATERIAL QUANTITIES <br />Initial volume: 254,971 CCY Swell factor: 1.124 <br />Loose volume: 286,486 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,850 lbs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />28.63 LCY <br />Cycle Time: <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.