Laserfiche WebLink
of�o o T <br /> R02AMATION, MINING AND SAFETY <br /> wg COLORADO DIV] <br /> * * �olorado 80203 ph(303)866 <br /> 1313 Sherman Str -3567 <br /> �8�6• LJW/thrn RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEE'IMAY 1 1 ZUO / <br /> - <br /> File No.: M- 2015-001 Site Name: Bonds Pit 0#REC*LAA&WTi6N <br /> MINING MD SA—FM <br /> County La Plata TR# (DRMS Use only) <br /> Permittee: CrossFire Aggregate Services, LLC <br /> Operator(If Other than Permittee): sa me <br /> Permittee Representative: P e rry Neil or Nathan Barton <br /> Please provide a brief description of the proposed revision: o <br /> Realignment of Access Road through Pit to meet La Plata County requirements. o N <br /> 03 O <br /> �' ;n <br /> v a O <br /> � O <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or applicatior <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submittei <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TI <br /> the Division may require the submittal of a permit amendment to make the required or desired changeE <br /> to the permit. <br /> 0 <br /> rG <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the o -� <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will 3 <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 T <br /> 110d, 112d(1, 2 or 3) $1006 T <br />