My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-20_PERMIT FILE - M2020027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020027
>
2020-05-20_PERMIT FILE - M2020027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:30:56 PM
Creation date
5/21/2020 6:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020027
IBM Index Class Name
Permit File
Doc Date
5/20/2020
Doc Name
Decision Document
From
DRMS
To
Oldcastle SW Group dba Four Corners Materials
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Grade topsoil . ...... ........................ <br /> Site: South Fork#1 Pit Permit Action: New permit PermiVJob04: M2020027 <br /> .............. ......................... <br /> PROJECT IDENTIFICATION <br /> Task 002 State: Colorado Abbreviation: None <br /> .... ....... ....................... <br /> Date: 5/20/20201 County: Rio Grande Filename: M027-002 <br /> User: SJM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: ---C-AT--16-M---------------------- Horsepower: 2917 <br /> Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG), <br /> ............... <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $8�2.71 NA <br /> ............... <br /> Operating Cost/Hour: $70.09 100 <br /> Ripper Ownership Cost/Hour: $0.00 NA <br /> Ripper Operating Cost/Hour: $0.00 <br /> Operator Cost/Hour: $28.52 NA <br /> Total Unit Cost/Hour; S 181.31 <br /> —1-1..................... <br /> Total Fleet Cost/Hour: $181.31 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 30.00 acres <br /> Source of estimated acreage: Permit <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1,50 mph <br /> Selected Application: - -Finish grading'(0-2,5 m&- 1.5 <br /> Selected Blade Angle: .................................................... 30 degrees <br /> Effective Blade Length: 13.90 feet <br /> .......... " 'Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 11.90 feet <br /> Unadjusted Hourly Unit Production: 2.1636 acres/hour <br /> Jq,b_CgD_d_iJiqLi.Correction Factors Site Altitude: 6500 feet <br /> Source <br /> Altitude Adj. 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (lsh/d,fav) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 1.9473 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.9473 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: I Grader(s) Total job time: 15.41 Hours <br /> Unit cost: $93-11 per acre Total job cost: $2,793 <br /> CIRCFS Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.