Laserfiche WebLink
° . °`° TR044ATION, <br /> COLORADO DIVISI MINING AND SAFETY <br /> * ■� p ( ) RECEIVED <br /> * * 1313 Sherman Street � SJM/thm �rado 80203 h 303 866-3567 <br /> /876 � ' <br /> MAY 9 2020 <br /> REQUEST FOR TECHNICAL REVISION TR COVER SHEET W( OV/ <br /> 0F RE"CMLAT" <br /> File No.: M- 7_510 2 Site Name: ?rTv1S 1 lor �� Noa MINING8� qF <br /> County JL�.�� TR# QRMS Use only) <br /> Permittee: m 4M <br /> Operator (If Other than Permittee): <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: `�`�s� i�� ©t= �'✓��' � ��} <br /> (5- . I-A-PR) /� �1.1=1 t�5(��L� �O �z. "T�t'1�Z. 6-11� �►�� �'4 a� �5)A ceu <br /> "T 1S ►r� A -FL00i) ?LA)I�Ii_ t4WU _1_)Ai. G?OA\)`LL. Ty�ezjpL IS b�-'P <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or o � <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, - �' <br /> CL <br /> the Division may require the submittal of a permit amendment to make the required or desired changes N <br /> to the permit. o IV <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> detennine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 0 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the Cn o <br /> permittee requests additional time, in writing, to provide the required information. 3 � h <br /> � ° O <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide 3 m ,A <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 <br /> 1 1 Od, 112d(1, 2 or 3) S 1006 <br />