My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-15_PERMIT FILE - M2020021 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020021
>
2020-05-15_PERMIT FILE - M2020021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:31:50 AM
Creation date
5/15/2020 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020021
IBM Index Class Name
Permit File
Doc Date
5/15/2020
Doc Name
Decision Document
From
DRMS
To
Wolf Creek Rock & Gravel LLC
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Saddlebrook Pit <br />MOTOR GRADER WORK <br />Grade topsoil <br />PROJECT IDENTIFICATION <br />Permit Action: New permit <br />Task #: 002 State: <br />Date: 5/12/2020 County: <br />User: SJM <br />Colorado <br />Mineral <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Permit/Job#: M2020021 <br />Abbreviation: None <br />Filename: M021-002 <br />Basic Machine: CAT 16M Horsepower: 297 <br />Ripper Attachment: Shift Basis: l per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />ipper Ownership Cost/Hour: <br />ipper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />QUANTITIES <br />Total Area to be graded or ripped: 9.10 <br />R <br />R <br />MATERIAL <br />$82.71 <br />Total Fleet Cost/Hour: <br />CIRCES Cost Estimating Software <br />NA <br />$70A9 <br />I00 <br />$0.00 <br />NA <br />$0.00 <br />feet <br />$28.52 <br />NA <br />$181.31 <br />$181.31 <br />acres/hour <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Permit app <br />acres <br />1.50 <br />Finish grading <br />mph <br />(0-2.5 mph) - 1.5 <br />0 <br />degrees <br />I6.00 <br />feet <br />2.00 <br />feet <br />14.00 <br />feet <br />2.5455 <br />acres/hour <br />Site Altitude: 8000 feet <br />Source <br />Altitude Adj: 1.00 CAT HB <br />Job Efficiency: 0.90 _ _ (1 sh/d, Fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 2.2909 acres/Hour <br />Adjusted Hourly Fleet Production: 2.2909 acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 _ Grader(s) Total job time: 3.97 Hours <br />Unit cost: $79.14 per acre Total job cost: $720 <br />
The URL can be used to link to this page
Your browser does not support the video tag.