Laserfiche WebLink
BOREHOLE SEALING WORK <br /> Task description: Plug and Seal Additional Collom In-Pit Drill Holes <br /> Site: Colowyo Coal Mine Permit Action: MR216 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task 001 State: Colorado Abbreviation: None <br /> Date: 5/14/2020 County: Moffat Filename: CO19-001 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> UNIT COSTS <br /> Borehole Sealing/Item <br /> Description Method Diameter Length Quantity Unit Unit Total Cost <br /> Cost <br /> Bottom Plug PVC plug-6 in. 5.625" 65670 53.00 EA $58.97 $3,125.21 <br /> diameter borehole <br /> - Fill Holes Portland cement 5.625" 65670 161.00 bag $13.40 $2,157.40 <br /> with Cement grout(Bag,material <br /> cost only...94 lb. bag) <br /> - Borehole Borehole NA NA 53.00 EA $32.00 $1,696.00 <br /> Marker location/identification <br /> marker(EA,material <br /> cost only) <br /> -Drill Rig Truck Mounted-3.0 NA NA 682.00 EA $93.76 $63,944.32 <br /> Time in. - 1,700 ft. capy. <br /> -Water Water Tanker, 2,500 NA NA 682.00 EA $27.02 $18,427.64 <br /> Truck Time Gal. <br /> Job Hours: 682.00 Total Cost: S89,351.00 <br />