Laserfiche WebLink
cow. <br /> `` $ COLA /IIl�TIIVG SAFETY <br /> 4, G� * 303)866-3567 ECE�VED <br /> 1876 <br /> AME/mac <br /> MAY 12� p <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET # 14/� <br /> 1977-410 Cross Gold Mine DIVINIONOF ANDDON <br /> File No.: M- Site Name: <br /> SAFETY <br /> County Boulder TR# (DRMS Use only) <br /> Permittee:Calais Resources Colorado, Inc. <br /> Operator(If Other than Permittee): <br /> Richard Mittasch <br /> Permittee Representative: 0 9 <br /> Please provide a brief description of the proposed revision: i <br /> co <br /> o � <br /> This Technical Revision has been prepared to present geotechnical stability analyses for the slopes y c <br /> _a._ - . . a - . _ .. ea - -.. _ . - ... - . _ 1,'. - - - .• _ aa a a - 'ea - - ... ..a o r ,i <br /> dated March 26, 2020 in conjunction with the Cross Mine, DRMS Permit No. M-1977-410. <br /> As defined by the Minerals Rules, a Technical Revision (TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> 4 X <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the N _ <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Re If ed TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $ <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 El <br />