My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-05-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 6:34:53 PM
Creation date
5/12/2020 6:26:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
5/6/2020
Doc Name
Findings & Cost Estimate
From
DRMS
To
Colowyo Coal Company LP
Type & Sequence
MT7
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taylor Pit and the Collom Pit, multiple seam mining was conducted in the East and West <br />Pit, which are currently in reclamation and two seams were mined in the Section 16 Pit, <br />which is also in reclamation. Coal from the Colowyo Mine is trucked to the Gossard <br />Loadout and shipped to market by rail. <br /> <br />Permit History <br /> <br />Pre-startup activities for a surface mine permit commenced in the summer of 1973 and <br />Open Pit Mining Permit No. 76-15 was issued on August 31, 1976. This permit was <br />converted to Development and Extraction Mining Permit No. 76-15C/A on January 25, <br />1977. An application for Permit C-1981-019 was submitted on September 13, 1982 and <br />the permanent program permit was issued on November 4, 1982. The permit was <br />renewed on July 10, 1987 (RN-01), June 30, 1992 (RN-02), November 5, 1997 (RN-03), <br />November 5, 2002 (RN-04), October 23, 2009 (RN-05), May 20, 2013(RN-06), and <br />August 14, 2018 (RN-07) <br /> <br />Mining History <br /> <br />Underground mining activities in the vicinity of the current permit were started in 1914. <br />Colowyo conducted underground mining operations at the Red Wing Mine from 1945- <br />1974. Surface mining operations began in 1976 and have continued uninterrupted to <br />date. Initially permitted as a single seam operation, Colowyo began its operations in the <br />East Pit, mining from north to south. The East Pit was developed as a multi-seam <br />operation (eight seams) in 1977. An eastern appendage of the East Pit, the Section 11 Pit, <br />was approved in 1991 and was later absorbed into the East Pit. Coal extraction by open <br />pit mining concluded in the East Pit in 2003 with highwall mining continuing until 2006. <br />Operations in the two-seam Section 16 Pit were initiated in 1998. The Section 16 Pit <br />mining was initially conducted from east to west but was later changed to mine from <br />north to south, as coal resources were depleted. Mining in the Section 16 Pit concluded <br />in 2002. The West Pit was developed as a multi-seam operation (eight seams) in 1998. <br />The pit progressed from north to south and active mining operations were completed in <br />2015. The South Taylor Pit was developed as a multi-seam operation (7 seams) in 2007. <br />The mining in the South Taylor Pit progresses from east to west. Coal extraction in the <br />South Taylor Pit continues to date. With the approval of Permit Revision No. 4, the <br />Collom Pit Area, located west of the South Taylor Pit, has been incorporated into <br />ermit Application Package (PAP). Mining operations in the Collom Pit <br />began in 2016 and is progressing from the north to the south. The Collom Pit is <br />developed as a multi-seam operation (8 seams). <br /> <br />Auger mining was conducted at the interface between the Section 11 Pit and East Pit <br />from 1993-1994. Highwall mining operations were conducted in the East Pit from 2004- <br />2006. Highwall mining operations were conducted in the West Pit in 2004, 2006, 2007 <br />and 2008. Highwall mining operations were conducted in the South Taylor Pit beginning <br />in 2009 and are also planned for other suitable areas as mining progresses. While no <br />highwall mining has been conducted at the Collom Pit, highwall mining has been <br />Colowyo Mine Midterm Review No. 8 <br />Permit No. C-1981-019 May 5, 2020 <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.