Laserfiche WebLink
Cross-Caribou Mine (M1977-410) Technical Revision No. 6 <br /> r r.� <br /> �.t <br /> 2-10' berms throughout the property act as containment barriers for any spill that should occur. <br /> 7. Floor Drains and storage <br /> Due to the age of the property and lack of access to historical documents, no drawings or additional <br /> information were found during this discovery. <br /> • Ore Building floor drain has been permanently sealed. No other floor drains in the building. <br /> • Cross Mine Shop has no floor drains in the Shop. Only greywater is drained to a 500g vault. <br /> The Cross Mine utilizes an outhouse. <br /> • Caribou Mine has two floor drains outside of the shop area. These two drains along with <br /> greywater from the building are drained to a 1000 gal.vault. <br /> 8. Proposed SPCC plan <br /> Attached is the SPCC plan proposed by GIR. Upon approval of content and format, GIR will populate the <br /> form with all pertinent information and return the completed plan for final approval by DRMS. Please <br /> note,that all record keeping will be done digitally and managed via a data collection app. <br /> 8 <br />