My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-11_REVISION - M1977410 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2020-05-11_REVISION - M1977410 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 7:04:00 PM
Creation date
5/12/2020 6:37:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
REVISION
Doc Date
5/11/2020
Doc Name
Request for Technical Revision
From
Calais Resources Colorado, Inc.
To
DRMS
Type & Sequence
TR6
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORAI TR06 NGAAECOWD <br /> ♦ * � - <br /> * * 1313 ', -6-3567 <br /> 1g76 AME/mac <br /> MAY ��2020 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET DIVISION OF RECLAMAnON <br /> 1977-410 Cross Gold Mine MININGMDSAFEIY <br /> File No.: M- Site Name: �Cl ,� -( <br /> 17 <br /> County Boulder TR# (DR MS Use on�l " <br /> Permittee: Calais Resources Colorado, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Richard Mittasch o <br /> o' 3 <br /> Please provide a brief description of the proposed revision: v <br /> ._ y <br /> This TR is to provide the equivalent of a site specific SPCC plan, including a description of all a <br /> 0 <br /> N <br /> fuel/oil storage locations, spill prevention measures, spill response and mitigation operation and a disposal plan. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> J <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the d I;U <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to a M <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 1 Oc, 1 11, 112 construction <br /> materials, and 112 quarries $2 ' <br /> 112 hard rock(not DMO) $175 1-1 <br /> l IOd, 112d(l, 2 or 3) $1006 F] <br />
The URL can be used to link to this page
Your browser does not support the video tag.