Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br /> 461400$01741.0041100ftikReVerWttlf4fP'4$14r 5', k 4,t,,,t ,p1C hL',o, b•• ��'M!.c'aec;mb'�T' fi'a�� :d t+A„'ktdc 040444 <br /> 4.14 BACKFILLING AND GRADING <br /> 4.14.1 General Requirements <br /> The mining operations of Colowyo will not employ the use of contour mining methods. <br /> Colowyo does not have thin or thick overburden as defined in Subsection 4.14.4 or Subsection 4.14.5. <br /> The mining plan, as described in Section 2.05.3, maximizes coal conservation and recovery while minimizing <br /> adverse environmental impacts. Because of the multi-seam mining configuration planned by Colowyo, an <br /> exemption from the 180 day or four spoil ridge limitations has been formally requested and granted by the <br /> Division. The mining plan has been designed as a continuously-moving open pit operation with the mine <br /> advancing approximately parallel to the dip of the numerous coal seams. The mining operation is an <br /> extension of the existing Section 16 mine operation, and will progress in a southward direction with <br /> shovels/trucks/proceeding along the entire length of the mining area(Map 23A). With the numerous benches <br /> used in an open pit operation, the mine area will be opened for some time until the equipment comes back to <br /> initiate another pass on a designated bench. <br /> As the mining operations remove coal seams, the mining area must be left open until such time as the lower- <br /> most coal seam can be recovered. With the mining configuration, the time differences between mining the <br /> upper-most seam versus the lower-most seam will be greater than 180 days. As the operation advances, <br /> backfilling will be as contemporaneous as practical but not so as to interfere with removal of the lower-most <br /> coal seam. Colowyo will rough backfill and grade as shown on the Map 29. All disturbed areas will be <br /> returned to the appropriate final contour by grading and backfilling with the use of a dragline, trucks, dozers, <br /> and scrapers. Additional detail of the backfilling and grading for the mining operation is set forth in the <br /> discussion under Sections 2.05.3 and 2.05.4. <br /> The area to be mined will be restored to a topography approximating pre-mining grades. The slopes of <br /> backfilled areas, as necessary, will utilize terraces and/or contour furrows for erosion control and stability. <br /> These terraces and contour furrows will be constructed according to the requirements outlined in Section <br /> 2.06.2. Where applicable, Colowyo will retain all overburden and spoil on the solid portion of existing <br /> benches. The final graded slopes will not exceed the approximate original pre-mining slope grade as shown <br /> on the Map 19B. Post-mining surface drainage channels will be located to minimize erosion and to minimize <br /> slippage. <br /> 4.14.2 General Grading Requirements <br /> The final graded slopes at the mining operation will not exceed the approximate original pre-mining slope <br /> grade as shown on Map 19B. Colowyo will retain all overburden and spoil material on solid portions of <br /> existing or new benches. The final highwall at the operation will be eliminated by backfilling overburden into <br /> the final pit area. <br /> Small depressions of a holding capacity slightly greater than one cubic yard of water may be used to create a <br /> moist micro climate to aid in shrub establishment. See Section 2.05.4, Planting and Seeding Methods for <br /> further information regarding these small depressions. Also, several stock watering ponds will be constructed <br /> to compliment the post-mining land use. Providing a supply of water is an integral part of the grazing post- <br /> mining land use. Colowyo will not be mining on any slopes above 20°as shown on Map 18A. <br /> Final grading before topsoil placement will be conducted in a manner that minimizes erosion and provides a <br /> surface for the topsoil that minimizes slippage. Final grading will be accomplished so that overall grades will <br /> not exceed lv:3h. The plan for backfilling and grading is shown graphically on the Map 29. <br /> South Taylor/Lower Wilson—Rule 4,Page 10 Revision Date: 12/20/19 <br /> Revision No.: TR-135 <br />