Laserfiche WebLink
FREEBOARD <br /> 1 -•,: <br /> 2' <br /> Typical Temporary Side Channell <br /> Depth of <br /> Slope Flow Flow(D) Freeboard Total Velocity <br /> Channel Channel Section (%) (cfs) (ft) (ft) Depth(ft) (fps) <br /> From To <br /> 100+00 90+00 3.0% 0.0 0.2 0.3 0.5 3.0 <br /> South Collection 90+00 50+00 3.0% 0.0 0.2 0.3 0.5 3.0 <br /> Ditch 50+00 30+00 5.0% 0.0 0.2 0.3 0.5 3.0 <br /> 30+00 0+00 5.0% 46.4 0.9 0.3 1.2 8.9 <br /> Prospect East <br /> Collection Ditch 16+50 0+00 3.0% 0.0 2 0.2 0.3 0.5 3.0 <br /> New East Taylor <br /> 3.0% 0.02 0.2 0.3 0.5 3.0 <br /> Ditch <br /> Stoker Ditch 3.0% 0.02 0.2 0.3 0.5 3.0 <br /> Streeter Side Ditch 33+00 0+00 3.0% 0.0 2 0.2 0.3 0.5 3.0 <br /> 1 This table presents historical information only. Ditches previously listed on this table,but never constructed have been <br /> removed to match as-built conditions at the Colowyo mine site. <br /> 2 Minimum Flow of 1 cfs used to size temporary side channels where no flow is predicted for the post-mine drainage <br /> conditions. <br /> Revision Date: 12/20/19 <br /> Exh. 7-14B-2 Revision No.:TR-135 <br />