Laserfiche WebLink
SEDCAD 4 for Windows <br /> 1^.....,..,46.1001a_on1n oo...vin I c..ti..,nti <br /> 17 <br /> Structure #3(Null) <br /> Null Above Streeter Pond <br /> Structure #2(Pond) <br /> Streeter Pond <br /> Pond Inputs: <br /> Initial Pool Elev: 6,583.00 ft <br /> Initial Pool: 2.45 ac-ft <br /> Perforated Riser <br /> Riser Barrel Number of <br /> Riser Height Barrel Barrel Slope (ft)Spillway Elev <br /> Diameter (ft) Diameter Length(ft) (%) Manning's n Holes per <br /> (in) (in) Elev <br /> 12.00 4.00 18.00 87.00 4.50 0.0150 6,585.00 2 <br /> Emergency Spillway <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) Sideslope Sideslope Width(ft) <br /> 6,588.00 50.00 1.50:1 1.50:1 20.00 <br /> Pond Results: <br /> Peak Elevation: 6,589.14 ft <br /> Dewater Time: 1.10 days <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 6,578.00 0.010 0.000 0.000 <br /> 6,579.00 0.070 0.035 0.000 <br /> 6,580.00 0.275 0.197 0.000 <br /> 6,581.00 0.441 0.551 0.000 <br /> 6,582.00 1.100 1.297 0.000 <br /> 6,583.00 1.200 2.447 0.000 <br /> 6,584.00 1.500 3.794 0.000 <br /> 6,585.00 1.600 5.344 0.000 Spillway#1 <br /> 6,586.00 1.800 7.043 3.782 5.44* <br /> 6,587.00 2.000 8.942 5.348 5.05 <br /> 6,588.00 2.100 10.992 6.550 4.40 Spillway#2 <br /> 6,589.00 2.200 13.142 45.017 10.80 <br /> 6,589.14 2.271 13.456 59.413 0.65 Peak Stage <br /> Filename:Exhibit 7-14E Streeter Pond 25 Yr 24 Hr sc4 Printed 02-10-2020 <br />