Laserfiche WebLink
The Streeter and Section 16 Ponds were inspected. Each pond held water. Embankments were stable and no issues <br />were observed. <br />Water was observed within the Finial East Pit Ditch and the associated stock tanks held water. <br />East Pit drainages. <br />GENERAL MINE PLAN COMPLIANCE: <br />Sidehill and Section 26 Ponds. <br />Coal is being mined from the Collom Pit by truck and shovel operations. The coal is being transported north east of <br />the pit and placed in the Coal Stockpile Area located in the Collom facility area. The pile was being shaped by <br />dozers at the time of the inspection. <br />Operations in the South Taylor Pit continues as normal. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />2019 and 2020 West Pit backfill and regrade reclamation parcels were inspected. Slopes are stable with no erosion <br />observed and blend well into previous reclamation parcel. Vegetation is observed and has begun to establish itself. <br />