Laserfiche WebLink
TABLE OF CONTENTS <br /> <br /> South Taylor/Lower Wilson - ii Revision Date: 2/13/20 <br /> Revision No.: TR-135 <br />2.05.3 (5) Topsoil ........................................................................................................................ 73  <br />2.05.3 (6) Overburden ................................................................................................................. 74  <br />2.05.4 (1) Reclamation Plan ........................................................................................................ 75  <br />2.05.4 (2)(a)  Reclamation Timetable ............................................................................................... 76  <br />2.05.4 (2)(b) Reclamation Costs ...................................................................................................... 76  <br />2.05.4 (2)(c)  Backfilling Plan .......................................................................................................... 76  <br />2.05.4 (2)(d) Topsoil Salvage and Replacement ............................................................................. 77  <br />2.05.4 (2) (e) Reclamation Revegetation .......................................................................................... 77  <br />2.05.4(f-h) Disposal, Mine Openings, Water and Air Control ..................................................... 77  <br />2.05.5 Post-Mining Land Uses .............................................................................................. 77  <br />2.05.6 Mitigation of Impacts of Mining Operations .............................................................. 77  <br />2.05.6 (1)  Air Pollution Control Plan .......................................................................................... 77  <br />2.05.6 (2) Fish and Wildlife Plan ................................................................................................ 78  <br />2.05.6 (3)(a) Protection of the Hydrologic Balance ........................................................................ 78  <br />2.05.6 (3)(b)(i & ii) Hydrologic Controls ................................................................................................... 79  <br />2.05.6 (3)(b)(iii)  Probable Hydrologic Consequences ........................................................................... 79  <br />2.05.6 (4) Protection of Public Parks and Historic Places .......................................................... 86  <br />2.05.6 (5-6)  Surface Mining near Underground Mining; Subsidence Control ............................... 86  <br />2.06 PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ............................ 86  <br />2.06.1-3 Scope, Experimental Mining, and Mountain Top Removal ....................................... 86  <br />2.06.4 Steep Slope Mining .................................................................................................... 86  <br />2.06.5 Variance from Approximate Original Contour Restoration Requirements ................ 86  <br />2.06.5 (2) (a) Post-Mining Land Use .......................................................................................................... 86  <br />2.06.5 (2) (b) Consultation with Planning Agencies ................................................................................... 87  <br />2.06.5 (2) (c) Alternative Postmining Land Uses ....................................................................................... 87  <br />2.06.5 (2) (d) Watershed Improvements ..................................................................................................... 87  <br />2.06.5 (2) (e) Owner Approval.................................................................................................................... 87  <br />2.06.5 (2) (f) Compliance with Limited Variances ..................................................................................... 87  <br />2.06.6 Prime Farmlands ........................................................................................................ 87  <br />2.06.7 Reclamation Variance ................................................................................................ 87  <br />2.06.8 Alluvial Valley Floor (AVF) ...................................................................................... 87  <br />2.06.9  Augering and Highwall Mining ................................................................................. 90  <br />2.06.10-2.06.11 Processing Plants, In-Situ Processing ............................................................................... 91  <br />2.06.12.1 Coal Refuse Piles ....................................................................................................... 91  <br />2.07 – 2.10 VARIOUS ..................................................................................................................... 91  <br />RULE 3 – PERFORMANCE BOND ........................................................................................................... 1  <br />RULE 4 – PERFORMANCE STANDARDS ............................................................................................... 1  <br />4.02 SIGNS AND MARKERS ................................................................................................ 1  <br />4.02.1 Specifications ............................................................................................................... 1  <br />4.02.2 Mine and Permit Identification Signs ........................................................................... 1  <br />4.02.3 Perimeter Markers ........................................................................................................ 1  <br />4.02.4 Duration of Maintenance .............................................................................................. 1  <br />4.02.5 Stream Buffer Zone Markers ........................................................................................ 1  <br />4.02.6 Blasting Signs ............................................................................................................... 1  <br />4.02.7 Topsoil Markers ........................................................................................................... 1  <br />4.03 ROADWAYS .................................................................................................................. 1  <br />4.03.1 Haul Roads ................................................................................................................... 2  <br />4.03.2 Access Roads ................................................................................................................ 2  <br />4.03.3 Light-Use Roads ........................................................................................................... 2  <br />4.04 SUPPORT FACILITIES ................................................................................................. 2  <br />4.05 HYDROLOGIC BALANCE ........................................................................................... 3