RULE 2 PERMITS <br />Once the overburden is sufficiently fragmented to allow for efficient removal and loading, overburden <br />removal will commence. The location of the area to be mined is shown on the Mine Plan Map (Map <br />23A). <br />Colowyo will utilize two distinct methods of overburden removal in the mining operation of South <br />Taylor: (1) truck/shovel techniques and (2) dragline technique. By combining the use of both shovel and <br />trucks, and draglines, Colowyo can both efficiently and economically handle the logistics involved in a <br />multiseam, open pit coal mine. <br />The truck/shovel operation will be used to open up the initial boxcut, and then will be generally utilized in <br />removing overburden over the upper coal seams. In some areas of the pit the truck/ shovel will be utilized <br />by taking all seams from the "X3" to the "G8" (X3, X4, B0, B1, B2, B3, C5, D1, D2, E2, F1, F6, F7, FA, <br />FB, G7 and G8). In the dragline portions of the pit the dragline will generally uncover the "F6" through <br />the "G8" (F6, F7, FA, FB, G7 and G8). From time to time, based on production requirements, <br />truck/shovel or loader/truck methods may be utilized to assist the dragline operation in the lower seams. <br />The overburden material is removed in a series of lifts or benches; the height of these benches will be <br />influenced by the distance between the coal seams to be mined (see Map 24B, Mining Range Diagrams), <br />and the equipment mining those benches. <br />Overburden removal by the, truck/shovel method progresses on approximately 170-240 foot wide <br />benches and has a maximum highwall height of about 60 feet. Electric shovels or front-end loaders load <br />this overburden into 50, 170, 190 or 240 -ton trucks. The trucks then haul the overburden around the <br />active coal pit and dump this material into the mined -out or stock pile areas. The truck/shovel operation <br />will always precede the dragline operation in the multiple seam pits. <br />A dragline will be used for overburden removal over the lower coal seams and the generalized multi -seam <br />dragline sequence at the Colowyo operation is as follows: <br />The dragline will begin the sequence by removing the overburden over the "F6" through the "FA" seams <br />in a single sidecast mode, spoiling the overburden into the previously mined -out pit. The "FB" through <br />the "G8" is removed from the spoil side of the pit. The spoil from the benching operation will be placed <br />to allow the draglines sufficient room and adequate reach to remove overburden while operating on the <br />spoil side. The draglines construct temporary ramps in order to walk to the spoil side. <br />The "F6" overburden is first drilled and blasted, removed by the draglines, 76" coal is removed behind <br />the advance of the draglines, then the drilling is initiated on the overburden of the 77" seam. This <br />sequence is typical through the "G8" seam. With the dragline only mining through the F6 and below <br />spoil, it will ensure that any suspect level spoil, based upon the suitability criteria, will stay in the bottom <br />of the pit and will buried by a minimum of 50 foot of suitable Truck Shovel material. <br />Upon complete removal of the overburden over the "G8" seam, the draglines walk around the end of the <br />pit to the next cut to begin removal of the overburden over "F6" coal seam. <br />No Special Handling Procedures will be required for the overburden in the South Taylor pit. The current <br />overburden sampling program that will be used for the East Pit, West Pit, Section 16 Pit and the South <br />Taylor Pit is described within Volume 1, Section 2.05. It was discussed between the Division of <br />Reclamation, Mining and Safety (DRMS) and Colowyo that suspect levels of the Sodium Adsorption <br />Ratio (SAR), Selenium (Se), Boron (B), Saturation % (Sat), and Molybdenum (Mo) need to be addressed <br />in more detail to determine that Special Handling Procedures, that are outside the normal pit operational <br />procedures, will not be needed in the South Taylor pit area. For this purpose, Colowyo will only use the <br />South Taylor/Lower Wilson — Rule 2; Page 68 Revision Date: 4/7/17 <br />Revision No.: RN -07 <br />