RULE 2 PERMITS
<br />Once the overburden is sufficiently fragmented to allow for efficient removal and loading, overburden
<br />removal will commence. The location of the area to be mined is shown on the Mine Plan Map (Map
<br />23A).
<br />Colowyo will utilize two distinct methods of overburden removal in the mining operation of South
<br />Taylor: (1) truck/shovel techniques and (2) dragline technique. By combining the use of both shovel and
<br />trucks, and draglines, Colowyo can both efficiently and economically handle the logistics involved in a
<br />multiseam, open pit coal mine.
<br />The truck/shovel operation will be used to open up the initial boxcut, and then will be generally utilized in
<br />removing overburden over the upper coal seams. In some areas of the pit the truck/ shovel will be utilized
<br />by taking all seams from the "X3" to the "G8" (X3, X4, B0, B1, B2, B3, C5, D1, D2, E2, F1, F6, F7, FA,
<br />FB, G7 and G8). In the dragline portions of the pit the dragline will generally uncover the "F6" through
<br />the "G8" (F6, F7, FA, FB, G7 and G8). From time to time, based on production requirements,
<br />truck/shovel or loader/truck methods may be utilized to assist the dragline operation in the lower seams.
<br />The overburden material is removed in a series of lifts or benches; the height of these benches will be
<br />influenced by the distance between the coal seams to be mined (see Map 24B, Mining Range Diagrams),
<br />and the equipment mining those benches.
<br />Overburden removal by the, truck/shovel method progresses on approximately 170-240 foot wide
<br />benches and has a maximum highwall height of about 60 feet. Electric shovels or front-end loaders load
<br />this overburden into 50, 170, 190 or 240 -ton trucks. The trucks then haul the overburden around the
<br />active coal pit and dump this material into the mined -out or stock pile areas. The truck/shovel operation
<br />will always precede the dragline operation in the multiple seam pits.
<br />A dragline will be used for overburden removal over the lower coal seams and the generalized multi -seam
<br />dragline sequence at the Colowyo operation is as follows:
<br />The dragline will begin the sequence by removing the overburden over the "F6" through the "FA" seams
<br />in a single sidecast mode, spoiling the overburden into the previously mined -out pit. The "FB" through
<br />the "G8" is removed from the spoil side of the pit. The spoil from the benching operation will be placed
<br />to allow the draglines sufficient room and adequate reach to remove overburden while operating on the
<br />spoil side. The draglines construct temporary ramps in order to walk to the spoil side.
<br />The "F6" overburden is first drilled and blasted, removed by the draglines, 76" coal is removed behind
<br />the advance of the draglines, then the drilling is initiated on the overburden of the 77" seam. This
<br />sequence is typical through the "G8" seam. With the dragline only mining through the F6 and below
<br />spoil, it will ensure that any suspect level spoil, based upon the suitability criteria, will stay in the bottom
<br />of the pit and will buried by a minimum of 50 foot of suitable Truck Shovel material.
<br />Upon complete removal of the overburden over the "G8" seam, the draglines walk around the end of the
<br />pit to the next cut to begin removal of the overburden over "F6" coal seam.
<br />No Special Handling Procedures will be required for the overburden in the South Taylor pit. The current
<br />overburden sampling program that will be used for the East Pit, West Pit, Section 16 Pit and the South
<br />Taylor Pit is described within Volume 1, Section 2.05. It was discussed between the Division of
<br />Reclamation, Mining and Safety (DRMS) and Colowyo that suspect levels of the Sodium Adsorption
<br />Ratio (SAR), Selenium (Se), Boron (B), Saturation % (Sat), and Molybdenum (Mo) need to be addressed
<br />in more detail to determine that Special Handling Procedures, that are outside the normal pit operational
<br />procedures, will not be needed in the South Taylor pit area. For this purpose, Colowyo will only use the
<br />South Taylor/Lower Wilson — Rule 2; Page 68 Revision Date: 4/7/17