Laserfiche WebLink
EXHIBIT 13C <br />Volume 20 Page 17 Revision Date: 2/18/20 <br /> Revision No.: MR-215 <br /> <br />Table 13C-27 Topsoil Stockpile Revegetation <br />Topsoil Stockpile <br />Number Acres to be Reseeded <br />26B 2.2 <br />26A 24.2 <br />36A 4.1 <br /> <br />Table 13C-28 Collom In-Pit Drill Holes <br />Drill Hole Number Plugging <br />Requirements <br />C-18-01 through C-18-27 Please see Exhibit 27, <br />Item 3 <br /> <br />Table 13C-29 Collom Pit Power Distribution <br />Task <br />Remove Power Lines 16,897 Feet <br />Topsoil Replacement 25,000 Cubic Yards <br />Reseed Disturbance 7.6 Acres <br /> <br />Table 13C-30 Clean Water Diversions <br />Clean Water Diversion <br />Overburden <br />Replacement (cubic <br />yards) <br />Topsoil <br />Replacement (cubic <br />yards) <br />Acres to be <br />Reseeded <br />CWD-1 5,923 4,998 4.3 <br />