My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-03-31_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-03-31_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 4:56:13 PM
Creation date
5/6/2020 9:28:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/31/2020
Doc Name
Emergency Spillway, Temporary and Permanent Chanel Designs, Existing Structures
Section_Exhibit Name
Exhibit 07 Item 14
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 7, Item 14, Table 1 <br />Summary of Ditch and Channel Design Parameters <br />East Taylor Ditch Flow, Q Slope, % <br />Bottom <br />Width <br />Side Slope, <br />H:1V <br />Rip Rap, <br />D50, in <br />East Taylor Ditch, Sta 0+00 to 19+55 96.6 22.0 12.0 3.0 18 <br /> Sta 38+33 to 77+00 76.0 10.7 12.0 3.0 18 <br />Flow, Q Slope, % <br />Bottom <br />Width <br />Side Slope, <br />H:1V <br />Rip Rap, <br />D50, in <br />Taylor Ditch Flow, Q Slope, % <br />Bottom <br />Width <br />Side Slope, <br />H:1V <br />Rip Rap, <br />D50, in <br />Taylor Ditch, Sta 0 to 10+67 4.4 13 0.0 3.0 n/a; veg. <br />Section 16 Pond Ditch Extension Flow, Q Slope, %Bottom Side Slope, Rip Rap, <br />Section 16 Pond Ditch Extension 9.7 2 0.0 3.0 <br />NA, <br />in rock <br />East Pit Reclamation Area Flow, Q Slope, % <br />Bottom <br />Width <br />Side Slope, <br />H:1V <br />Rip Rap, <br />D50, in <br />Prospect Ditch Reach 1 to Sta 1+50 10.0 10.7 12 2 n/a; veg. <br />Prospect Ditch, Sta 1+50 to PD-1 4.4 28.2 12 2 n/a; veg. <br />Prospect Ditch, above Pond PD-1 4.1 12-15 12 2 n/a; veg. <br />N. Trib. East Pit Ditch Reach 1 10.2 21 12 2 n/a; veg. <br />N. Trib. East Pit Ditch Reach 2 11.9 10 - 13 12 2 6 <br />Final East Pit Ditch all 3 Reaches 5.9-27.2 4-16.8 12 2 6 <br />Combined NTEP/Final E Pit Ditch 35.4 24 12 2 9 <br />Note: For ditches in the South Taylor Area, See Volume 13, Table 1, Exh. 7-20 Part E. (This includes <br />the following Ditches <br />West Taylor East Tributary Ditch <br />West Taylor West Tributary Ditch <br />S29-A Trib <br />Trib. D Ditch <br />Trib. F DitchExh7-14OExh7-14RExh7-14IExh7-14J(Reserved for future use)Exh7-14LExh 7H - Generalized Ditch Design Procedures (See Text) <br />Exh. 7-14-7 <br />Revision Date: 2/13/20 <br />Revision No. TR-135
The URL can be used to link to this page
Your browser does not support the video tag.